44 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available2,230 MWUnknownNow (snapshot)variant: reinforced_grid1 Feb 2026
InjectionGeneration (any)Available644 MWUnknownNow (snapshot)variant: existing_grid1 Feb 2026
InjectionUnknownAvailable80%UnknownNow (snapshot)variant: existing_grid:solar_100mw1 Feb 2026
InjectionUnknownAvailable79%UnknownNow (snapshot)variant: existing_grid:solar_300mw1 Feb 2026
InjectionUnknownAvailable43%UnknownNow (snapshot)variant: existing_grid:wind_100mw1 Feb 2026
InjectionUnknownAvailable41%UnknownNow (snapshot)variant: existing_grid:wind_300mw1 Feb 2026
InjectionUnknownAvailable100%UnknownNow (snapshot)variant: reinforced_grid:solar_100mw1 Feb 2026
InjectionUnknownAvailable100%UnknownNow (snapshot)variant: reinforced_grid:solar_300mw1 Feb 2026
InjectionUnknownAvailable98%UnknownNow (snapshot)variant: reinforced_grid:wind_100mw1 Feb 2026
InjectionUnknownAvailable97%UnknownNow (snapshot)variant: reinforced_grid:wind_300mw1 Feb 2026
OfftakeLoad (any)Available0 MWUnknownNow (snapshot)variant: existing_grid1 Feb 2026
OfftakeLoad (any)Available0 MWUnknownNow (snapshot)variant: reinforced_grid1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: existing_grid:0006_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: existing_grid:0006_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: existing_grid:0617_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: existing_grid:0617_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: existing_grid:1721_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: existing_grid:1721_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: existing_grid:2100_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: existing_grid:2100_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: existing_grid:0006_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: existing_grid:0006_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: existing_grid:0617_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: existing_grid:0617_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: existing_grid:1721_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: existing_grid:1721_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: existing_grid:2100_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: existing_grid:2100_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: reinforced_grid:0006_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: reinforced_grid:0006_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: reinforced_grid:0617_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: reinforced_grid:0617_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: reinforced_grid:1721_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: reinforced_grid:1721_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: reinforced_grid:2100_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: summer · variant: reinforced_grid:2100_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: reinforced_grid:0006_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: reinforced_grid:0006_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: reinforced_grid:0617_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: reinforced_grid:0617_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: reinforced_grid:1721_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: reinforced_grid:1721_300mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: reinforced_grid:2100_100mw1 Feb 2026
OfftakeLoad (any)Available0%UnknownNow (snapshot)season: winter · variant: reinforced_grid:2100_300mw1 Feb 2026

Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

2,230 MW

Granted

The operator's latest published dataset reports 2230 MW under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reinforced_grid
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: source field
available_capacity_production_MW

Injection · Generation (any) · Available

644 MW

Granted

The operator's latest published dataset reports 644 MW under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: existing_grid
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: source field
available_capacity_production_MW

Injection · Unknown · Available

80%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 80 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: existing_grid:solar_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: measure
share of a typical year's production that a plant of this size could deliver
Operator note: plant size mw
100
Operator note: source field
cap_solar_100MW_pct
Operator note: technology label
solar

Injection · Unknown · Available

79%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 79 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: existing_grid:solar_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: measure
share of a typical year's production that a plant of this size could deliver
Operator note: plant size mw
300
Operator note: source field
cap_solar_300MW_pct
Operator note: technology label
solar

Injection · Unknown · Available

43%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 43 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: existing_grid:wind_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: measure
share of a typical year's production that a plant of this size could deliver
Operator note: plant size mw
100
Operator note: source field
cap_wind_100MW_pct
Operator note: technology label
wind

Injection · Unknown · Available

41%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 41 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: existing_grid:wind_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: measure
share of a typical year's production that a plant of this size could deliver
Operator note: plant size mw
300
Operator note: source field
cap_wind_300MW_pct
Operator note: technology label
wind

Injection · Unknown · Available

100%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 100 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reinforced_grid:solar_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: measure
share of a typical year's production that a plant of this size could deliver
Operator note: plant size mw
100
Operator note: source field
cap_solar_100MW_pct
Operator note: technology label
solar

Injection · Unknown · Available

100%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 100 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reinforced_grid:solar_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: measure
share of a typical year's production that a plant of this size could deliver
Operator note: plant size mw
300
Operator note: source field
cap_solar_300MW_pct
Operator note: technology label
solar

Injection · Unknown · Available

98%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 98 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reinforced_grid:wind_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: measure
share of a typical year's production that a plant of this size could deliver
Operator note: plant size mw
100
Operator note: source field
cap_wind_100MW_pct
Operator note: technology label
wind

Injection · Unknown · Available

97%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 97 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reinforced_grid:wind_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: measure
share of a typical year's production that a plant of this size could deliver
Operator note: plant size mw
300
Operator note: source field
cap_wind_300MW_pct
Operator note: technology label
wind

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: existing_grid
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours with zero consumption capacity
0
Operator note: source field
cap_cons_MW
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reinforced_grid
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours with zero consumption capacity
0
Operator note: source field
cap_cons_MW
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: existing_grid:0006_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
00-06
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_su_0006_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: existing_grid:0006_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
00-06
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_su_0006_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: existing_grid:0617_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
06-17
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_su_0617_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: existing_grid:0617_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
06-17
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_su_0617_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: existing_grid:1721_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
17-21
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_su_1721_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: existing_grid:1721_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
17-21
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_su_1721_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: existing_grid:2100_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
21-00
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_su_2100_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: existing_grid:2100_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
21-00
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_su_2100_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: existing_grid:0006_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
00-06
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_wi_0006_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: existing_grid:0006_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
00-06
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_wi_0006_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: existing_grid:0617_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
06-17
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_wi_0617_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: existing_grid:0617_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
06-17
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_wi_0617_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: existing_grid:1721_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
17-21
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_wi_1721_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: existing_grid:1721_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
17-21
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_wi_1721_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: existing_grid:2100_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
21-00
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_wi_2100_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: existing_grid:2100_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:existing_grid · payload sha256 ee9738bb55fb…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
existing_grid
Operator note: hours
21-00
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_wi_2100_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: reinforced_grid:0006_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
00-06
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_su_0006_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: reinforced_grid:0006_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
00-06
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_su_0006_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: reinforced_grid:0617_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
06-17
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_su_0617_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: reinforced_grid:0617_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
06-17
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_su_0617_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: reinforced_grid:1721_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
17-21
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_su_1721_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: reinforced_grid:1721_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
17-21
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_su_1721_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: reinforced_grid:2100_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
21-00
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_su_2100_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: summer · variant: reinforced_grid:2100_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
21-00
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_su_2100_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: reinforced_grid:0006_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
00-06
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_wi_0006_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: reinforced_grid:0006_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
00-06
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_wi_0006_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: reinforced_grid:0617_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
06-17
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_wi_0617_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: reinforced_grid:0617_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
06-17
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_wi_0617_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: reinforced_grid:1721_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
17-21
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_wi_1721_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: reinforced_grid:1721_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
17-21
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_wi_1721_300MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: reinforced_grid:2100_100mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
21-00
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
100
Operator note: source field
cap_cons_wi_2100_100MW_pct
Operator note: zero with no zero hours
true

Offtake · Load (any) · Available

0%

Published in percent; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0 percent under methodology dk_energinet_tso_capacity_2026.

Firmness
Unknown
Horizon
Now (snapshot) · season: winter · variant: reinforced_grid:2100_300mw
Methodology
dk_energinet_tso_capacity_2026Energinet transmission-station connection capacitybasis operator calculated · network state unknown · comparability class dk_energinet_tso_capacityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Feb 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-09-26 05:56 UTC
Source health
Stale
Provenance
dk_energinet_tso_capacityrecord LYK_150:reinforced_grid · payload sha256 17012dbde714…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: Source: Energinet (www.energidataservice.dk) (last updated 2026-02-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: grid precondition
reinforced_grid
Operator note: hours
21-00
Operator note: hours with zero consumption capacity
0
Operator note: plant size mw
300
Operator note: source field
cap_cons_wi_2100_300MW_pct
Operator note: zero with no zero hours
true

History

Served series only

Injection · Generation (any) · Available

current 644 MW

26 Sep 2026: 644 MW
26 Sep 2026range 644–644 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current644 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Unknown · Available

current 80%

26 Sep 2026: 80%
26 Sep 2026range 80–80%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current80%

Time axis: when we observed each value, not the operator’s effective date.

Injection · Unknown · Available

current 79%

26 Sep 2026: 79%
26 Sep 2026range 79–79%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current79%

Time axis: when we observed each value, not the operator’s effective date.

Injection · Unknown · Available

current 43%

26 Sep 2026: 43%
26 Sep 2026range 43–43%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current43%

Time axis: when we observed each value, not the operator’s effective date.

Injection · Unknown · Available

current 41%

26 Sep 2026: 41%
26 Sep 2026range 41–41%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current41%

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0–0 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 0%

26 Sep 2026: 0%
26 Sep 2026range 0–0%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0%

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 0%

26 Sep 2026: 0%
26 Sep 2026range 0–0%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0%

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 0%

26 Sep 2026: 0%
26 Sep 2026range 0–0%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0%

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 0%

26 Sep 2026: 0%
26 Sep 2026range 0–0%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0%

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 0%

26 Sep 2026: 0%
26 Sep 2026range 0–0%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0%

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 0%

26 Sep 2026: 0%
26 Sep 2026range 0–0%26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0%

Time axis: when we observed each value, not the operator’s effective date.

The first 12 of 44 served series with a history. The history route returns every one of them.