pt_ren_caracterizacao
REN — Caracterização da RNT para efeitos de acesso à rede (Anexo N)
Published by REN – Rede Eléctrica Nacional · PT · Yearly
pending_reviewDisabledREN's yearly characterisation of the transmission network at 31 December; its Annex N gives, per RNT installation, the injection capacity allocated to generation not yet connected (to UPP/UPAC and to others) and the capacity remaining from DGEG's de-activations, in MVA.
What is withheld, and why
Every value from this source is withheld. The operator’s terms do not clearly allow us to redistribute its figures, and when signals conflict the more restrictive reading wins until the operator confirms otherwise in writing. Records are still listed — with capacity.value null, access.status "withheld" and a link to the publication — so you know the operator publishes something there.
The publication is still read and kept, because operators overwrite their files and a history not recorded when it happened can never be recovered. If reuse is cleared, customers get the history as well as the present.
mercado.ren.pt serves no legal-notice text; www.ren.pt's terms forbid reproducing or distributing its contents except where the law or REN allows, and extracting or reusing all or a substantial part of its contents and databases. Likely derived_only or link_only absent REN's permission.
Licence and rights evidence
- Licence
- REN — termos e condições (www.ren.pt)
- Attribution
- None required
- Technical access
- Yes
- Commercial use
- Not established
- May be cached
- Not established
- May be redistributed
- No
- Derived data allowed
- Not established
Methodology
0 version(s)
No methodology is recorded for this source.
How the publication maps to the model
- availability types
- ["allocated","available"]
- binding
- false
- directions
- ["injection"]
- firmness
- []
- geometry precision
- none
- includes reserved projects
- null
- non additive
- true
- notes
- ["Quadro II lists about 90 RNT installations with 'Atribuída (não UPP/UPAC)', 'Atribuída a UPP/UPAC' (allocated) and 'Remanescente das descativações efetuadas pela DGEG' (available) in MVA; Quadro I gives national attributable capacity by source and year (4,564 MVA in total for the 2025 edition)."]
- spatial scope
- substation
- technologies
- []
- units
- ["MVA"]
Query this source
curl "https://api.gridcapacityapi.com/v1/capacity/search?source=pt_ren_caracterizacao&limit=20" \ -H "Authorization: Bearer gc_live_..."