UKPN Network Scenario Headroom Report (DFES 2025, LTDS November 2025 baseline)
gb_ukpn_dfes_nshr_2026 · v2026-05Unused firm substation capacity (MW) per year and DFES scenario, from LTDS November 2025 network loading and the Distribution Future Energy Scenarios 2025; demand headroom against the latest firm capacity, generation headroom against LTDS equipment ratings.
- Capacity basis
- operator calculated
- Network state
- unknown
- Binding
- No
- Additive across assets
- No — do not sum these figures
- The method accounts for
- reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Comparability class
- gb_ukpn_nshr
- Documentation
- Operator’s method (opens the operator’s site)
The operator’s own caveats
- please note unused capacity may be contractually committed to customers.
- Those seeking connection should contact our connections gateway to understand the latest view of available capacity.
- more capacity may be available for customers on a non-firm, flexible or curtailable connection.