SPEN Network Development Plan Part 2 — Network Scenario Headroom Report
gb_spen_nshr_2026 · v2026Post-intervention headroom (MW) per substation or substation group, year and scenario, from existing network models, scenario forecasts and known intervention plans; each year for ten years, then every five years to 2050.
- Capacity basis
- operator calculated
- Network state
- unknown
- Binding
- No
- Additive across assets
- No — do not sum these figures
- The method accounts for
- reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Comparability class
- gb_spen_nshr
- Documentation
- Operator’s method (opens the operator’s site)
The operator’s own caveats
- This is not necessarily equal to the contractually available headroom shown in connection heatmaps.
- SP Energy Networks does not accept any responsibility or liability for the accuracy or completeness of this data