NGED Long Term Development Statement, Table 3: firm capacity of substation
gb_nged_ltds_table3 · vLTDS Tabular Model, Table 3 (table-3-2025.csv)NGED's Long Term Development Statement, prepared under its licence and Ofgem's Form of Statement, lists per BSP and primary substation the firm capacity (the capacity that remains with the largest single circuit or transformer out of service), the measured maximum demand of the current year and a five-year demand forecast in line with NGED's Distribution Future Energy Scenarios.
- Capacity basis
- operator published
- Network state
- n minus 1
- Binding
- No
- Additive across assets
- No. Do not sum these figures.
- The method accounts for
- reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Comparability class
- gb_ltds_table3_firm_capacity
- Documentation
- Operator’s method (opens the operator’s site)
The operator’s own caveats
- The LTDS is intended to assist parties in identifying and assessing opportunities on NGED's network; it is not an offer of capacity.