NESO connection registers (TEC, Embedded, Interconnector)

Published by National Energy System Operator · GB · Unknown

Grantedcommercial_use_with_attributionDisabled

NESO's registers of contracted and connected transmission projects: the Transmission Entry Capacity register, the Scottish embedded register and the interconnector register. Queue context, not hosting capacity.

What is withheld, and why

Nothing is withheld. Values are served with the attribution the licence asks for: Supported by National Energy SO Open Data. Keep it with any figure you show.

The licence grants commercial reuse with the attribution statement above; the source is blocked by robots.txt, not by its licence.

Licence and rights evidence

Attribution
Supported by National Energy SO Open Datarequired
Technical access
No
Commercial use
Yes
May be cached
Yes
May be redistributed
Yes
Derived data allowed
Yes

Evidence

Methodology

0 version(s)

No methodology is recorded for this source.

How the publication maps to the model

availability types
[]
binding
false
directions
[]
firmness
[]
geometry precision
unknown
includes reserved projects
null
non additive
true
notes
["Contracted and connected transmission projects in MW of Transmission Entry Capacity, with a Gate 1 / Gate 2 column since the November 2025 connections reform: connected, contracted or waitlisted capacity per connection site, never headroom.","NESO's own notes warn that capacity across stages and technologies \"is currently presented in aggregate, which may result in duplicate entries\".","The TEC register resource seen in discovery was tec-register-24-september-2026.csv (datastore active, metadata_modified 2026-09-25): the file name carries its issue date; the reissue cadence is not stated."]
spatial scope
transmission_connection_site
technologies
[]
units
[]

Query this source

curl "https://api.gridcapacityapi.com/v1/capacity/search?source=gb_neso_registers&limit=20" \  -H "Authorization: Bearer gc_live_..."