Skip to content
GridCapacityAPI.com

fr_rte_cartostock

RTE — Capacités d'accueil pour les installations de stockage (Cartostock)

Published by RTE Réseau de Transport d'Électricité · FR · Unknown

Archived, pending reviewpending_reviewDisabled

Per poste of the transmission network, the maximum capacity (MW) available to a storage installation without limitation, usable both for withdrawal and for injection, accounting for the accepted-offer queue, S3REnR reservations and decided works.

What is withheld, and why

Every value from this source is withheld. The operator’s terms do not clearly allow us to redistribute its figures, and when signals conflict the more restrictive reading wins until the operator confirms otherwise in writing. Records are still listed — with capacity.value null, access.status "withheld" and a link to the publication — so you know the operator publishes something there.

The publication is still read and kept, because operators overwrite their files and a history not recorded when it happened can never be recovered. If reuse is cleared, customers get the history as well as the present.

No licence text was found for this data. Even with one, ingestion waits for RTE's permission for automated access, which the host's robots.txt currently withholds.

Licence and rights evidence

Licence
Not stated
Attribution
None required
Technical access
No
Commercial use
Not established
May be cached
Not established
May be redistributed
Not established
Derived data allowed
Not established

Methodology

0 version(s)

No methodology is recorded for this source.

How the publication maps to the model

availability types
["available"]
binding
false
directions
["bidirectional"]
firmness
["firm"]
geometry precision
unknown
includes reserved projects
null
non additive
true
notes
["RTE's page: the capacity is « accessible à la fois en soutirage et en injection », « sans limitation », and « les capacités des différents postes ne sont cependant pas cumulables ». Requests without an accepted connection offer are not included; only electrical capacity was studied (bay space was not). Postes in red are below 5 MW."]
spatial scope
substation
technologies
["storage_other"]
units
["MW"]

Query this source

curl "https://api.gridcapacityapi.com/v1/capacity/search?source=fr_rte_cartostock&limit=20" \  -H "Authorization: Bearer gc_live_..."