EDF SEI: Capacités d'accueil du réseau, Corse et Outre-mer

Published by EDF Systèmes Énergétiques Insulaires / FR / Quarterly

Grantedredistribution_allowedDegraded

Per poste in Corsica and the four overseas departments: the HTB injection status (available / saturated), the remaining transformation capacity, the HTA connection queue, and the S2REnR/S3REnR reserved and remaining capacity, in MW, as defined by CRE délibération n° 2019-275.

What is withheld, and why

Nothing is withheld. Values from this source are served as published.

Licence Ouverte asks for the source and the date of its last update; the date is the dataset's dataUpdatedAt, which every record carries as source_effective_at. A run notes it if the dataset's licence title ever changes.

Licence and rights evidence

Attribution
Source : EDF SEI (opendata.edf.fr), « Capacités d'accueil du réseau - Corse & Outre-Mer », Licence Ouverte v2.0, mise à jour du jeu de données : voir freshness.source_effective_atrequired
Technical access
Yes
Commercial use
Yes
May be cached
Yes
May be redistributed
Yes
Derived data allowed
Yes

Evidence

Methodology

3 version(s)

EDF SEI HTB injection status per poste

fr_edf_sei_htb_injection · vCRE délibération n° 2019-275 (dataset updated 2026-08-25)

Whether injection capacity remains on the transmission (HTB) network at the poste, taking into account projects with a connection request not yet commissioned and the capacity reserved under the S2REnR/S3REnR. Published as a word, not a number.

Capacity basis
operator published
Network state
unknown
Binding
No
Additive across assets
No. Do not sum these figures.
The method accounts for
reserved: yes · allocated: yes · pre-reserved: not stated · pending requests: yes
Comparability class
fr_edf_sei_htb_status

The operator’s own caveats

  • Des offres de raccordement sont suspendues sur certaines zones, en raison de la saturation des capacités techniques du réseau.

EDF SEI S2REnR/S3REnR reservation, remaining capacity and HTA queue per poste

fr_edf_sei_s2renr · vCRE délibération n° 2019-275 (dataset updated 2026-08-25)

Capacity reserved for renewables under the territory's S2REnR/S3REnR once its works are commissioned; the reservation minus what is allocated (remaining), in total and on existing assets only; and the injection power of HTA projects in the connection queue. MW.

Capacity basis
operator published
Network state
unknown
Binding
No
Additive across assets
No. Do not sum these figures.
The method accounts for
reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Comparability class
fr_edf_sei_s2renr

The operator’s own caveats

  • Des offres de raccordement sont suspendues sur certaines zones, en raison de la saturation des capacités techniques du réseau.
  • La révision des S2REnR/S3REnR est engagée dans les 5 territoires.

EDF SEI remaining transformation capacity per poste

fr_edf_sei_transformation · vCRE délibération n° 2019-275 (dataset updated 2026-08-25)

Capacity remaining for injection at the poste's transformation, not counting projects with a connection request not yet commissioned, nor the capacity reserved under the S2REnR/S3REnR. MW.

Capacity basis
operator published
Network state
unknown
Binding
No
Additive across assets
No. Do not sum these figures.
The method accounts for
reserved: no · allocated: no · pre-reserved: not stated · pending requests: no
Comparability class
fr_edf_sei_transformation

The operator’s own caveats

  • Des offres de raccordement sont suspendues sur certaines zones, en raison de la saturation des capacités techniques du réseau.

How the publication maps to the model

availability types
["available","allocated","reserved"]
binding
false
directions
["injection"]
firmness
["firm","conditional","unknown"]
geometry precision
none
includes reserved projects
null
non additive
true
notes
["One line per poste, keyed by territoire + poste: EDF SEI publishes no poste code, and 'Petit Bourg' is a poste in both Guadeloupe and Martinique. The name is the only identifier the operator gives.","No location. EDF SEI removed the postes' coordinates « afin de renforcer la sécurité publique »; the territory travels as the asset's region and nothing re-derives a position.","capacite_dinjection_sur_le_reseau_htb is a word, not a number: Disponible → available, Saturée (with or without a qualifier) → unavailable, anything else → unknown, the operator's label always kept.","The transformation figure does not deduct the queue nor the reservation, the HTB status does: two different bases, two methodologies.","capacite_reservee_s2renrs3renr applies once every work of the scheme is commissioned: horizon target_year with no year, label s2renr_s3renr_completion.","puissance_totale_en_file_dattente_hta (the HTA queue) is allocated: queued projects consume the reservation. quote_part (the scheme's cost share, unit not stated) is an asset attribute.","The same CRE délibération n° 2019-275 defines Caparéseau's indicators; the comparability classes are nevertheless kept apart from fr_capareseau until a common computation is confirmed."]
spatial scope
substation
technologies
["generic_generation"]