es_viesgo_access_capacity

Viesgo — Capacidad de acceso de generación y de demanda por nudo

Published by Viesgo Distribución Eléctrica, S.L. · ES · Monthly

Archived, pending reviewpending_reviewHealthy

Generation and firm demand access capacity in MW at every busbar (substation x voltage level) of Viesgo Distribución Eléctrica, S.L.'s network, in the format CNMC made mandatory (BOE-A-2025-9913): available, occupied and admitted-not-resolved (generation also split by technology), with regulated substation codes and UTM coordinates.

What is withheld, and why

Every value from this source is withheld. The operator’s terms do not clearly allow us to redistribute its figures, and when signals conflict the more restrictive reading wins until the operator confirms otherwise in writing. Records are still listed — with capacity.value null, access.status "withheld" and a link to the publication — so you know the operator publishes something there.

The publication is still read and kept, because operators overwrite their files and a history not recorded when it happened can never be recovered. If reuse is cleared, customers get the history as well as the present.

The legal notice allows downloading and copying for personal and private use only; reproduction, distribution, transmission or modification for public or commercial purposes is excluded even with attribution, and no licence of any kind is granted. The bucket carries no terms of its own. Archived, never served, until the operator authorises reuse in writing.

Licence and rights evidence

Attribution
Fuente: Viesgo Distribución Eléctrica, S.L. (R1-005), publicación conforme a la Resolución CNMC de 30-04-2025required
Technical access
Yes
Commercial use
No
May be cached
Not established
May be redistributed
No
Derived data allowed
Not established

Evidence

Methodology

2 version(s)

Viesgo firm demand access capacity per busbar

es_viesgo_dem_2026 · vCircular 1/2024, Especificaciones de Detalle (Resolution 8-06-2025); BOE-A-2025-9913 format

The distributor's monthly firm demand access capacity per busbar under CNMC's common methodology, in the regulated file format: firm available, occupied and admitted but not yet evaluated, in MW.

Capacity basis
operator calculated
Network state
unknown
Binding
No
Additive across assets
No — do not sum these figures
The method accounts for
reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Comparability class
es_rdd_demand_firm_access_cir1_2024

The operator’s own caveats

  • The operator's website disclaimer gives no warranty of accuracy or currency.

Viesgo generation access capacity per busbar

es_viesgo_gen_2026 · vCircular 1/2021, Especificaciones de Detalle; BOE-A-2025-9913 format

The distributor's monthly generation access capacity per busbar under CNMC's common methodology, in the regulated file format: available, occupied and admitted but not yet resolved (also by technology), in MW.

Capacity basis
operator calculated
Network state
unknown
Binding
No
Additive across assets
No — do not sum these figures
The method accounts for
reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Comparability class
es_rdd_generation_access_cir1_2021

The operator’s own caveats

  • The operator's website disclaimer gives no warranty of accuracy or currency; no capacity-specific caveat is published beside the files.

How the publication maps to the model

availability types
["available","allocated","requested"]
binding
false
directions
["injection","offtake"]
firmness
["firm","unknown"]
geometry precision
exact
includes reserved projects
null
non additive
true
notes
["The 17 regulated generation columns and 15 demand columns of BOE-A-2025-9913, checked by header and read by position: capacidad (firme) disponible (available), ocupada (allocated), admitida y no resuelta / no evaluada (requested). Demand is firm by rule; generation firmness is not stated.","The generation file splits 'admitida y no resuelta' by technology in four extra columns (Eólica, Solar, Almacenamiento, Otras): four more requested series. 'Eólica' and 'Solar' do not say onshore/offshore or PV/thermal and the vocabulary has no plain wind or solar, so their technology is unknown, with the operator's label in the variant and in details; Almacenamiento is storage_other, Otras other. The total stays authoritative, and when the splits do not add up to it the total and the splits are flagged split_inconsistent.","A busbar is (Subestación, Nivel de Tensión); Subestación is the regulated substation code (Circular 8/2021 form B3). A busbar in both files is one asset with two records.","'Capacidad comprometida' (tender or Just-Transition reservation), 'Nudo limitado por Scc' and 'Nudo 0*' are flags on the available value; Comentarios travels in details.","The CSVs are Windows-1252; coordinates are ETRS89 UTM zone 30 (EPSG:25830), chosen from the province."]
spatial scope
busbar
technologies
["generic_generation","unknown","storage_other","other","generic_load"]
units
["MW"]

Query this source

curl "https://api.gridcapacityapi.com/v1/capacity/search?source=es_viesgo_access_capacity&limit=20" \  -H "Authorization: Bearer gc_live_..."
Viesgo — Capacidad de acceso de generación y de demanda por nudo (Viesgo Distribución Eléctrica, S.L.): licence, methodology and freshness · GridCapacity API