be_resa_perm_capacity
RESA — Capacités permanentes d'injection par poste
Published by RESA · BE · Unknown
blockedDisabledRESA's art. 29 publication: for each of its 37 HV/MV 'postes sources', the upstream (Elia) and local (HV/MV transformation) permanent injection capacity and their minimum, the MV voltage and a location.
What is withheld, and why
Nothing is fetched or served from this publication.
'Tous droits réservés'; navigating the site grants no licence; reproduction and rediffusion, partial or total, are forbidden without the rights holder's prior express authorisation; hyperlinks to the site need prior written authorisation. Upgrade path: written authorisation from RESA (avotreservice@resa.be); ask counsel whether the art. 29 duty or the Walloon PSI-reuse framework changes this for an intercommunale.
Licence and rights evidence
- Attribution
- None required
- Technical access
- Yes
- Commercial use
- No
- May be cached
- No
- May be redistributed
- No
- Derived data allowed
- No
Evidence
leurs représentations, reproductions, imbrications, diffusions et rediffusions, partielles ou totales, sont interdites
www.resa.be/fr/conditions-generales-utilisation/ (opens the operator’s site) · read 25 Sep 2026
Methodology
0 version(s)
No methodology is recorded for this source.
How the publication maps to the model
- availability types
- ["available"]
- binding
- false
- directions
- ["injection"]
- firmness
- ["firm"]
- geometry precision
- approximate
- includes reserved projects
- null
- non additive
- true
- notes
- ["No unit is stated anywhere in RESA's publication; MVA is assumed from the regulation (capacity defined in VA) and from AIEG and REW, which label the same figure MVA. 'n.c.' in the upstream component acts as 'no upstream limit' (permanente = min of the two)."]
- spatial scope
- substation
- technologies
- ["generic_generation"]
- units
- ["MVA"]
Query this source
curl "https://api.gridcapacityapi.com/v1/capacity/search?source=be_resa_perm_capacity&limit=20" \ -H "Authorization: Bearer gc_live_..."