APG: available connection capacity at transmission substations (Art. 50(4a) Regulation (EU) 2019/943)
at_apg_netzanschlusskapazitaeten_2026 · vStand 1. August 2026APG's monthly statement of the unrestricted injection and offtake capacity available per transmission substation, derived following the grid-compatibility check of its Allgemeine Netzbedingungen.
- Capacity basis
- operator calculated
- Network state
- unknown
- Binding
- No
- Additive across assets
- No. Do not sum these figures.
- The method accounts for
- reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Comparability class
- at_apg_tso_substation
- Documentation
- Operator’s method (opens the operator’s site)
The operator’s own caveats
- APG: no unrestricted connection capacity is currently free on its grid; a flexible (restricted) connection can in principle be requested, subject to a positive check.
- Connection rights within a distribution area lie with the distribution operator (§ 116 ElWG).