at_apg_netzanschlusskapazitaeten

APG: Netzanschlusskapazitäten

Published by Austrian Power Grid AG / AT / Monthly

Grantedcommercial_use_with_attributionHealthy

Austrian Power Grid's monthly table of available feed-in and offtake capacity (MW) at 83 transmission substations, with flexible-connection flags and the connection requests per federal state.

APG: Netzanschlusskapazitäten on a map

The 49 located assets in this publication, coloured by the spare capacity Austrian Power Grid AG publishes for each today. Click a point for its figure.

The map of Europe →

Loading the map…

What is withheld, and why

Nothing is withheld. Values are served with the attribution the licence asks for: Quelle: Austrian Power Grid AG, Netzanschlusskapazitäten (markt.apg.at), Stand laut Tabelle. Lage: GeoNames (CC BY 4.0). Keep it with any figure you show.

Switched to commercial_use_with_attribution on 2026-10-02 on the owner's report that the operator gave permission by telephone. No written confirmation is on file: ask for one, and an objection from the operator means rights_override = blocked the same day. The evidence below is the operator's published terms as read before the call. Before: On 2026-09-25 (Stand 1. August 2026) every substation showed 0 MW available in both directions. Locations are GeoNames localities (CC BY 4.0, credited above).

Licence and rights evidence

Attribution
Quelle: Austrian Power Grid AG, Netzanschlusskapazitäten (markt.apg.at), Stand laut Tabelle. Lage: GeoNames (CC BY 4.0)required
Technical access
Yes
Commercial use
Yes
May be cached
Yes
May be redistributed
Yes
Derived data allowed
Yes

Evidence

Methodology

1 version(s)

APG: available connection capacity at transmission substations (Art. 50(4a) Regulation (EU) 2019/943)

at_apg_netzanschlusskapazitaeten_2026 · vStand 1. August 2026

APG's monthly statement of the unrestricted injection and offtake capacity available per transmission substation, derived following the grid-compatibility check of its Allgemeine Netzbedingungen.

Capacity basis
operator calculated
Network state
unknown
Binding
No
Additive across assets
No. Do not sum these figures.
The method accounts for
reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Comparability class
at_apg_tso_substation

The operator’s own caveats

  • APG: no unrestricted connection capacity is currently free on its grid; a flexible (restricted) connection can in principle be requested, subject to a positive check.
  • Connection rights within a distribution area lie with the distribution operator (§ 116 ElWG).

How the publication maps to the model

availability types
["available"]
binding
false
directions
["injection","offtake"]
firmness
["firm"]
geometry precision
municipality
includes reserved projects
null
non additive
true
notes
["Transmission level (380/220/110 kV); the DSOs' substations are in at_ebutilities_capacity.","Available injection and offtake as published, in MW. APG's footnote says these are unrestricted (firm) capacities and that none is currently free on its grid.","'Flexible Anschlussmöglichkeit' (a restricted connection can be requested) travels as details.flexible_connection_possible. The per-state connection requests (MW) are attributes of each substation, not capacities, so they are never summed across a state's substations.","The table has no coordinates. Substations named after one locality in their state are placed there (GeoNames, municipality precision); region names (Südburgenland, Innkreis, Tauern) and ambiguous names are not placed."]
spatial scope
substation
technologies
["generic_generation","generic_load"]
units
["MW"]

Query this source

curl "https://api.gridcapacityapi.com/v1/capacity/search?source=at_apg_netzanschlusskapazitaeten&limit=20" \  -H "Authorization: Bearer gc_live_..."